Drilled Pier

 

  

 

 

 -- Pier depth is determined by an engineer (normally 12' to 15' below grade level).

-- Concrete is poured to form 1 ft. pad - reinforced with #4 rebar - as a base from which to raise the house.

-- After structure is leveled, sonotube cap is filled to the bottom of the beam.

-- Sonotube pier reinforced with steel of #4 rebar with metal stirrups placed 18" apart.

-- Pier shaft width is determined by an engineer (normally it is 12" wide).

-- 24" Bell at the bottom of the pier.

 

 

 

* Most effective for light structures.

* Hand-held auger is used due to it being less obtrusive and quieter than drilling rigs. The hand-held auger can also access hard-to-reach places inside the home.

Return to Services Page

 

Privacy Statement

Send mail to myfoundationguy@yahoo.com with questions or comments about this web site.                  
Copyright © 2007 AllinOne Foundation Repair, Inc. All rights reserved.
Last modified: 02/26/08

* Warranties offered vary depending upon job performed.